ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2013, Vol. 33 ›› Issue (1): 59-64.DOI: 10.3973/j.issn. 1672-741X.2013.01.010
Previous Articles Next Articles
GOU Mingzhong
Received:
Revised:
Online:
Published:
Abstract:
A highway tunnel in Xiameng crosses underneath operating YingtanXiamen railway line and turnout section with small clearance. Countermeasures, such as threelayer lining structure (primary reinforcement, first insitucast concrete lining and secondary insitucast concrete lining), 299 superlong pipe curtain installed in circular form, preconsolidation of ground by deephole grouting on the tunnel face and around the tunnel contour, 6step tunnel excavation by double side drift method, are taken. In the end, the tunnel crosses the railway successfully.
Key words: highway tunnel under supershallow cover, tunneling underneath existing railway line, railway protection, superlong pipe curtain, threelayer lining, double side drift method, sixstep excavation
GOU Mingzhong. Key Technology for Design and Construction of Highway Tunnel Crossing underneath Operating Railway Lines with Small Clearance[J]. Tunnel Construction, 2013, 33(1): 59-64.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn. 1672-741X.2013.01.010
http://www.suidaojs.com/EN/Y2013/V33/I1/59